04 September 2009 Build Progress Update:
Clachan Construction are now on site and the Saughton Skatepark
build has begun at last! Check out the photos below and check
back for regular build updates things progress.

All The Build Photo Updates:
22 April 2010 Build Photos >
14 April 2010 Build Photos >
19 March 2010 Build Photos >
14 March 2010 Build Photos >
05 March 2010 Build Photos >
18 February 2010 Build Photos >
28 January 2010 Build Photos >
22 January 2010 Build Photos >
15 December 2009 Build Photos >
03 December 2009 Build Photos >
15 November 2009 Build Photos >
04 September 2009 Build Photos >
|
The Skatepark Layout:

The final layout for the Saughton Park
site was developed by the skaters and riders in the ESP group
in conjunction with architects Urban Design Futures and Dave Sowerby
acting to produce the layout plans. The skatepark layout covers
approximately 2100 square meters and features a mix of bowl and
street features to cater for all skill levels.
View the skatepark design >
|